Skip to content

5 October 2026 · Telangana edition

SLBC Tunnel Crosses Its Most Difficult Shear Zone; 43.9-km Main Tunnel About 79% Complete, Water Targeted by June 2028

  • SLBC Tunnel
  • Srisailam Reservoir
  • Krishna River
  • Nalgonda
  • Fluorosis
  • Tunnel Engineering

Why it is in the news

On 4 October 2026, Irrigation Minister N. Uttam Kumar Reddy was told at a review that excavation of the Srisailam Left Bank Canal (SLBC) tunnel has moved past a major shear zone — a band of weak, fractured rock.

The exam angle

Syllabus: Group 1 Prelims: 6. World Geography, Indian Geography and Geography of Telangana state; 4. Environmental Issues: Disaster Management- Prevention and Mitigation Strategies; 10. Policies of Telangana State. Groups 2–4: Telangana irrigation projects and the Krishna basin.

Written for TGPSC Group 1. More from 5 October 2026 or all current affairs.

SLBC Tunnel Crosses Its Most Difficult Shear Zone; 43.9-km Main Tunnel About 79% Complete, Water Targeted by June 2028 · PrepShark