Why it is in the news
The Forest Advisory Committee (FAC) of the Union Environment Ministry (MoEFCC), at its 23 October 2026 meeting (reported 10 November), recommended in-principle (Stage-I) approval to divert about 511 ha of forest land in the Panna–Ranipur Tiger Corridor for the 1,800 MW Panari Pumped Storage Project in Satna and Panna districts, Madhya Pradesh, proposed by Sri Siddharth Infratech and Services.
The exam angle
Issue: India needs long-duration storage to integrate renewables, but the best PSP sites — hilly, forested terrain with head and water — often coincide with wildlife habitats and corridors.

